How does Dongguan CNC machining factory maintain the equipment?
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2022-03-23 13:40
- Views:
(Summary description)CNC machine tool equipment used in CNC processing plant workshop is mainly maintained by preventive maintenance, in the daily to strengthen the protection of equipment, such as in accordance with the cycle of inspection and maintenance, the specific content is as follows.
How does Dongguan CNC machining factory maintain the equipment?
(Summary description)CNC machine tool equipment used in CNC processing plant workshop is mainly maintained by preventive maintenance, in the daily to strengthen the protection of equipment, such as in accordance with the cycle of inspection and maintenance, the specific content is as follows.
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2022-03-23 13:40
- Views:
CNC machine tool equipment used in CNC processing plant workshop is mainly maintained by preventive maintenance, in the daily to strengthen the protection of equipment, such as in accordance with the cycle of inspection and maintenance, the specific content is as follows.
1. Daily inspection
CNC processing plant equipment daily inspection of the main items include hydraulic system, spindle smooth system, guide rail smooth system, cooling system, air pressure system. Is based on the normal condition of each system to be tested. For example, when the process of spindle smooth system testing, the power light should be on, the oil pressure pump should be normal operation, if the power light is not on, the spindle should be maintained to stop the state, and mechanical engineer contact. Carry out maintenance.
2. Weekly inspection
The main items of weekly inspection include machine parts, spindle smooth system, which should be properly checked every week, especially for machine parts to eradicate iron chips, external debris cleaning.
3. Monthly inspection
CNC processing plant equipment monthly inspection is mainly on the power supply and air to dryer to check. Power supply voltage under normal circumstances extra electricity 180V-220V, frequency 50Hz, if there are abnormalities, it should be measured and adjusted. Air dryer should be dismantled once a month, and then cleaned and installed.
4. Quarterly inspection
Quarterly inspection should be mainly from the machine bed, hydraulic system, spindle smooth system three aspects to check. For example, the CNC processing machine bed to check, mainly to see whether the machine precision, machine level to meet the requirements of the manual, if there are problems, should immediately contact with the mechanical engineer. The hydraulic system and spindle smooth system to check, if there are problems, should be replaced with new oil 6oL and 20L, respectively, and clean it.
5. Half-yearly inspection
After half a year the hydraulic system, spindle smooth system and X-axis of CNC machining plant equipment should be checked, if there is a problem, it should be replaced with new oil and then cleaned. Comprehensively familiar with and grasp the knowledge of preventive protection, but also must have a deeper understanding of the causes and treatment of abnormal phenomena of the oil pressure system and the necessary grasp. Such as when the oil pump does not spray oil, pressure is not normal, there is noise and other phenomena, should know what are the main reasons, what are the corresponding solutions.
Translated with www.DeepL.com/Translator (free version)
More Information
Contact Us
Tel: +86 769 82381279
Fax: +86 769 82381275
E-mail: info@st-group.cn
Add.: Dalang Town, Dongguan City, Guangdong Province, China
Copyright© 2022 ST Technologies Co., Ltd. All rights reserved Powered by www.300.cn SEO
Copyright© 2022 ST Technologies Co., Ltd. All rights reserved